Rockaway Beach Resort

Rockaway Beach Resort Online!

BOARD ADOPTS UPDATED DUES & ASSESSMENT POLICY

 Click here to read : Dues Policrevisedfinal 2010


Comments are off for this post

construction and upgrades ALERTS!!!

 During the week starting Friday April 9th, the restoration of the west yard  on completion of the Rip-Rap will likely begin.  That same week we will be completing the balance of the five ( 5 ) room upgrades on the forst floor of the North building.

Beginning Thursday April 29th, THE POOL WILL BE CLOSED UNTIL SATUDAY MAY 1ST.  We are doing routine maintenance and Cascade Pools will be hereto redo the pool and spa drains to comply with the the Federal  VGB law.


Comments are off for this post

DAY 16 OF THE RIP RAP REPAIR: LARGER STONE WORK

riprap2010E 006riprap2010E 001riprap2010E 005


Comments are off for this post

RIP-RAP WORK, DAY # 6: TRENCHES & FABRIC…

riprap2010driprap2010c 002riprap2010c 004riprap2010c 003


Comments are off for this post

DAY # 4 RIP RAP REPAIR CONTINUES!

riprap2010b 002riprap2010b 001riprap2010b 004riprap2010b 005riprap2010b


Comments are off for this post

THE RIP RAP PROJECT BEGINS!

riprap2010a 004riprap2010a 001The Rip-Rap and rebuild of the beach front, funded  the owner-approved assessment,  began January 12th.  The website will keep updating the progress with new pictures over the next several weeks.


Comments are off for this post

2010 DRIFTINGS & ANNUAL MEETING NOTICE

RBRDriftingsJan2010


Comments are off for this post

ASSESSMENT BALLOTS TALLIED DECEMBER 12TH. ASSESSMENT APPROVED 81.3 % YES TO 18.2 % NO

Nearly 75% of the owners voted in the recent  Assessment election and  the majority of owners approved the assessment.  The Annual Meeting Notice Driftingswill be availble here on the website  as soon as it is published.  It will contain  the President’s message and more tally result.  When we post the “DRIFTINGS ” we will also post the daly vote tally log sheet.  Owners can always drop by the office to inspect the  ballots  in the office here @ RBR.

Assessment Ballot Dec 09 Totals


Comments are off for this post

BOARD SETS ASSESSMENT: BALLOTS MAILED NOV. 9TH

The Board of Directors concluded at its regular meeting  on October 31, to repair the eroding retaining wall and fallen rip rap  in front of the north building.  To protect the owner’s investment will require an ASSESSMENT of $ 97.00 per share.  The ballots were sent out on Monday November 9th.  It is imperative that all owners vote and return the ballots by December 11th, 2009.  Here is a  picture of the area needing this emergency repair .  In the post about winter foam you can also see a picture where the foam and tide were pushed over the same area.ripraprepairpix 002

 to


Comments are off for this post

WINTER FOAM IN NOVEMBER!

November09foamstormpix 004November09foamstormpix 001November09foamstormpix 002


Comments are off for this post

Next Page »